Installation
Before your kit arrives
A good build starts before delivery day. Check these points against the manual of your exact model.
- Follow the manufacturer's manual
Prepare
Check your space
- Check the rules: permits, setbacks and HOA rules for a building; your state, your town and the U.S. Army Corps of Engineers for work in the water.
- Prepare a level base a little larger than the footprint: a slab, pavers or a gravel pad, as the manual says, with the anchor kit it lists.
- Measure the way in: gates, slopes and paths from the curb to the site, for boxes up to the length of the longest panel.
- For a boat lift or a dock: know the boat's weight and beam, the water depth through the season and what the bottom is made of.
- Line up two or three helpers, a ladder, a drill and the tools the manual lists; a small kit takes a few hours, a large building a few days.
Installation
Who installs it
Installation is not included in the price unless your order says so. Have it installed by a qualified installer (a licensed electrician for any electrical work), following the manufacturer's installation manual for your exact model, and keep the manual for maintenance and inspections.
- Build on a calm, dry day, and do not leave a half-built roof or wall panels exposed to wind.
- Anchor every building as its manual says before you store anything in it.
- Boat lift motors, solar chargers and dock lighting are wired by a licensed electrician where the code asks for it.
Not sure your space fits?
Send us your measurements and the model; we check it with you before you order.